LORBOTICS
  • Home
  • FIRST LEGO League
    • Animal Allies
    • Hydro Dynamics >
      • 24111 Hydro Dynamjcs
  • Into Orbit Global Innovation
    • Problem
    • Engineering Design Process
    • Solution
  • Mission Log 59
  • LEGO Adventures
  • Outreach
  • Class Projects

Day 59 - Test runs ?

9/28/2018

0 Comments

 
Picture
Hello Amethyst here! Today was a pretty intense day due to the fact we did so many test runs.. Me and Alex would set up and run the rover, and also Marshal and Gilbert worked on the controls and fixing the problems with the mission. In the middle of the one of the runs, I somehow forgot to put the module in... Which was super embarrassing and just super sad. We also figured out many flaws with the program, and tried to fix them. For example, in one of the missions the rover never came back to base which was a really bad problem during our run, so we had to run out and bring it back. The programmers fixed this problem, so the rover comes back to base, which was a good thing because it was super tiring running and dragging the rover back. During the run our goal was to finish a couple missions like, module, extraction, space travel, and solar panel array. We did accomplish some of these missions, but always somehow failed module, which was pretty stressful. Tomorrow we will, for sure, try to perfect our programs, and make sure to have one "successful" run. Talk to you guys later, peace! -Amethyst
0 Comments



Leave a Reply.

    Author

    Write something about yourself. No need to be fancy, just an overview.

    Archives

    November 2018
    October 2018
    September 2018
    August 2018

    Categories

    All

    RSS Feed

Proudly powered by Weebly
Icons made by Freepik from www.flaticon.com
  • Home
  • FIRST LEGO League
    • Animal Allies
    • Hydro Dynamics >
      • 24111 Hydro Dynamjcs
  • Into Orbit Global Innovation
    • Problem
    • Engineering Design Process
    • Solution
  • Mission Log 59
  • LEGO Adventures
  • Outreach
  • Class Projects